| Project
Description |
Contract
Owner |
Start/Completion
Date |
| Supply,
Installation & Commissioning of one (1) 500 kW Waukesha
Gas engine driven Generator Set |
TRINMAR |
May
2004 - August 2004
|
| Supply,
Installation & Commissioning of Gardner Denver Air Compressor
System |
BPTT |
June
2004 |
| CCI-
Supply of Control Valve - Rotary Drag Valve |
BPTT |
February
2004-September 2004 |
| Upgrade
of five (5) Production Separators, Samaan & Teak Fields |
BPTT |
December
2003 - December 2004 |
| Supply,
Installation & Commissioning of one (1) 500 kW Cummins
Diesel engine driven Generator Set |
BHP
Billiton (Beachfield)
|
December
2003 - July 2004 |
| Supply
& Installation of HDPE Piping |
Lange
Ballast |
December
2003 |
| Supply,
Installation & Commissioning of seven (7) Flood Pump
Package Systems with Diesel Engines |

GOTT: Ministry of Works
|
November
2003 |
| Supply,
Installation & Commissioning of three (3) Vertical Turbine
Fire Water Pumps |
BPTT |
May
2003 |
| Supply,
Installation & Commissioning of Platforms # 14, 20 &
7 Switchgear and Prefabricated Equipment |
TRINMAR |
April
2003 |
| Gas
Meter Calibration & Orifice Plate Servicing (4 Cycles
Per Year - 250 Meters) |
TRINMAR |
February
2003 |